11-29-2024  8:01 pm   •   PDX and SEA Weather

By The Skanner News | The Skanner News
Published: 31 March 2022

The Broadway Bridge will be closed to all traffic, including motor vehicles, bicyclists and pedestrians for maintenance work on Sunday, April 3 from 7 a.m. until as late as 7 p.m. 

The closure will allow a Multnomah County Transportation crew to perform preventive maintenance, replace signs, repair damaged areas of the deck and repair structures that have been damaged by vehicle crashes. The closure is not weather dependent.

Alternate routes 

The Steel Bridge is the nearest alternate crossing for bicyclists, pedestrians and motor vehicles. TriMet’s Broadway #17 bus will detour to the Steel Bridge during the closures. Portland Streetcar A and B Loop service will run across the Tilikum Crossing, turning back at NW 10th and NW Northrup on the west side and N Broadway and N Ross on the east side. For information about Portland Streetcar service, visit www.portlandstreetcar.org/alerts.

Multnomah County maintains the Broadway Bridge and five other Willamette River bridges. For information visit www.multco.us/bridges or follow us on Twitter @MultCoBridges.

Recently Published by The Skanner News

  • Default
  • Title
  • Date
  • Random

theskanner50yrs 250x300